7-Day Pre-Deployment Field Engineering Verification

Pre-Visit Site Connectivity & Workstation Readiness Checklist

Strata Carbon Assurance & Aegis Industrial Deployment Schedule
DistributionPlant IT Manager, OT Controls Lead, Cloud VPC Admin
Timing7 Business Days Prior to On-Site Engineering Kickoff
PurposeConfirm Workstation Wi-Fi, Outbound HTTPS, and Read-Only Historian Access
Section 1: On-Site Workstation & Wireless Connectivity (Day 1 Requirements)

Under Section 4.2 of the Master Subscription Agreement, Client provides authorized engineering personnel with dedicated wireless access and outbound HTTPS connectivity to ensure deployment milestones execute on schedule:

Status Item / Requirement Technical Specifications & Verification Guidance
Dedicated Contractor / Guest Wi-Fi SSID Provision wireless network credentials for Strata field engineers at the plant administration building, control room annex, and engineering trailers.
Unrestricted Outbound HTTPS (Port 443) Wi-Fi subnet permits outbound TLS 1.3 on TCP Port 443 to external container registries (gcr.io, pkg.dev, ghcr.io) and engineering endpoints (*.stratacarbonassurance.com).
TLS Deep-Packet Inspection Exemption Confirm corporate proxy or firewall does not strip mutual TLS (mTLS) certificates or container image pull signatures on outbound Port 443 from Strata laptops.
DMZ Jump Host / Bastion Reachability Ensure Strata engineering laptops on designated Wi-Fi (or via Client VPN) can reach Level 3.5 DMZ staging hosts via SSH (Port 22) or RDP (Port 3389).
Section 2: Customer-Hosted Sovereign Enclave Permissions (AWS / GCP / Azure)

Strata executes compute inside Client's cloud boundary with zero raw telemetry egress. Confirm cloud infrastructure readiness:

Status Control Domain Readiness Requirement
Target VPC & Private Subnet Dedicated private subnet in Client's cloud account with outbound NAT gateway (Port 443) for container image pulls and emitting signed Merkle roots.
15-Year WORM Storage Bucket Client-owned S3 bucket (with S3 Object Lock in COMPLIANCE mode) or GCS bucket (with Bucket Lock) encrypted with Client KMS Customer-Managed Key.
Deployment IAM Role / Service Principal Scoped deployment role granted to Strata lead engineer to execute Terraform / Helm deployment of enclave runtime containers.
STRATA CARBON ASSURANCE • PRE-VISIT READINESS CHECKLIST Section 3: DMZ Read-Only Historian Access & Sign-Off Confirmation
Section 3: Level 3.5 IT/OT DMZ & Historian Read-Only Access (SVC_STRATA_RO)

Deployment strictly enforces Purdue Level 3.5 read-only boundaries with zero control-loop write capability:

Status OT Security Control Configuration & Verification Standard
Zero Inbound Firewall Rules Confirmed Verify plant firewall denies all inbound connections from DMZ to control networks. DMZ collector initiates outbound HTTPS GET requests only.
Read-Only Service Account (SVC_STRATA_RO) Active Directory / Kerberos or PI Security identity created with Read Data strictly scoped to target Asset Framework tree (Write Data explicitly denied).
Asset Framework Template Imported Strata_Compliance_Facility_Template.xml imported into PI AF with the 12-18 core custody flow, check meter, and wellhead tags mapped.
72-Hour DMZ Spool Disk Allocated DMZ utility VM provisioned with at least 20 GB dedicated SSD storage for SQLite WAL ring-buffer to guarantee telemetry continuity across WAN outages.
Section 4: Pre-Visit Technical Sign-Off Confirmation

Plant IT/OT and network coordinators confirm the provisions above are scheduled or active prior to on-site engineering kickoff:

PLANT IT / OT COORDINATOR CONFIRMATION STRATA DEPLOYMENT LEAD CONFIRMATION
Assigned Wi-Fi SSID: ________________________________ Deployment Lead: Jeffrey Anthony Mendonca
DMZ Staging Jump Host IP: ___________________________ Target Kickoff Date: _____________________________
Coordinator Name: ________________________________ Signature: _______________________________________
Coordinator Title: _______________________________ Verification Date: ________________________________
Signature: _______________________________________ Status: Ready for 30-Day Core Launch