Aegis Industrial plant-health rules
A plant can look complete on a spreadsheet and still have a meter that stopped moving. Aegis Industrial is the rule set that scores that record before a draft is treated as ready.
Aegis Industrial is the plant-health rule set in this software. It is not the fleet monitor, and it is not a chain. The caller supplies the samples. The software does not open a connection into the plant control network. It is not connected to a live historian. A live pull is refused.
What can hold a draft
| AEGIS-AUD-001 | Fifteen clean one-minute custody samples are flat while the supplied upstream load is moving. Critical. Holds the draft. |
|---|---|
| AEGIS-AUD-002 | Calibration drift past 2.5 percent is critical and holds the draft. Drift past 1.5 percent with a seven-day slope toward that line is advisory and does not hold the draft. |
| AEGIS-AUD-003 | Capture, injection, and line-pack mass. A gap past 3 percent for more than 15 minutes is critical and holds the draft. A gap past 1.5 percent for more than 30 minutes warns. |
| AEGIS-AUD-004 | A substituted tier-1 historian value is critical and holds the draft. Tier-1 is stack flow, stack velocity, wellhead flow, non-condensable reinjection, and net export. |
| Quality | A sample marked not good, or marked questionable, holds the draft. That hold is not a separate rule code. |
What warns and does not hold the draft
| AEGIS-BAL-001 | Stack flow plus captured flow, against kiln meal and the two fuel streams, using caller-supplied factors, over more than two hours. More than 6 percent is a warning. A missing capture series is unevaluated. |
|---|---|
| AEGIS-BAL-002 | Specific energy against a supplied baseline, or a 30-day median when no baseline is supplied. A supplied ambient half-width keeps only matching temperatures. More than 8 percent is advisory. More than 15 percent is a warning. |
| AEGIS-MNT-001 | Kiln shell temperature. Above 620 F is advisory, above 700 F is a warning, above 780 F is critical. A five-day rise above 8 F per day is advisory. A supplied feed reference scales that rise. |
| AEGIS-MNT-002 | Compressor bearing, vibration, and discharge pressure against a supplied cluster. A warning also fires when vibration crosses 0.25 in/sec or bearing temperature rises more than 15 F above the baseline plus the caller ambient correction. |
| AEGIS-MNT-003 | Exchanger resistance against a supplied clean baseline. More than 12 percent is advisory. More than 25 percent is a warning. |
| AEGIS-MNT-004 | Injectivity against the same well seven days earlier. A drop past 10 percent is advisory. A drop past 20 percent is a warning. |
What the packet does with the result
The draft records the result the plant record supplies. It does not recompute the rules. QUARANTINED keeps that draft out of automated credit serialization. NOT_HELD is not a tax position. NO_RESULT is not a clearance. The customer still files. Strata is not the paid preparer. The chain anchor stays empty.
A maintenance notice can be prepared. No work-order endpoint is configured, so the notice is not delivered.
Offered schedule
The schedule is per physical facility. A signed order sets the fee. The homepage cash model is an illustration. It is not this schedule.
- Base monitoring is $25,000 per month ($300,000 per year).
- Turnkey workpaper support adds $15,000 per month ($180,000 per year).
- Aegis Industrial adds $12,500 per month. The range is $10,000 to $15,000 per month ($150,000 per year at $12,500).
- A desk placement is 15 percent to 20 percent, and only when a placement agreement is signed. The offer is not exclusive.
The kiln balance adds captured flow to stack flow. A supplied feed reference scales the five-day shell rise. A supplied ambient half-width limits the energy baseline to matching temperatures on plant.ambient_temp_f. The engine does not read a weather service.