JIL

SHAMROCK FOODS ENTERPRISE COMMAND CENTER

GCP HIPAA / HITRUST ENCLAVE

Unified Payment Integrity (340B-Style Billbacks), Strata Carbon Assurance (carbon.jil) & Aegis Plant Health

Facility Scope:
Audit Epoch ID: #103,842
3-Yr Shamrock Verified Value
$75,832,500
11.0x Net ROI on $6.90M Spend
Payment Integrity (340B Billbacks)
$64,875,000
PIEB Holds + AREB Smart Pay Rebuttals
Strata Carbon & Clean Fuel
$10,957,500
91,770 MT CO2e/yr (LCFS / 45Z / Scope 3)
Aegis Plant Health & FSMA 204
99.94% Uptime
Ignition SCADA + WORM CREB Ready
Executive Strategic Narrative

Turning Existing Dynamics 365 & Stanfield Operations Into Verified Cash

Shamrock already performs manual billbacks with proof of performance in Dynamics 365 and supplies dairy manure into the Stanfield RNG ecosystem. JIL Sovereign and Strata Carbon deploy a read-only verification layer on Google Cloud Platform that eliminates the 15% to 25% manual leakage gap without disrupting production systems.

Wave 1 POV Payback Period
2.0 Days
After Y1-Q2 Go-Live ($87.2k Outlay)
Pillar 1: Payment Integrity 340B-Style Engine

Deviated Pricing & Smart Pay Rebuttals

Automates manufacturer chargeback accumulators in Dynamics 365 before 60-day windows expire and joins 15-minute reefer temperature logs (<40.0F dairy threshold) to defeat invalid Smart Pay spoilage deductions.

3-Yr Shamrock Cash: $64,875,000
Pillar 2: Strata Carbon carbon.jil Rail

Stanfield Dairy RNG, Enteric & R99 Fleet

Seals 15-minute Ignition SQL historian tags for Stanfield's 14,000 milking cows (up to 30% enteric methane reduction + manure RNG) and 826 refrigerated trucks to capture CARB LCFS, IRS 45Z, and Scope 3 credits.

3-Yr Credit Value: $10,957,500
Pillar 3: Aegis Plant Health FSMA 204 & CREB

Predictive SCADA & Court-Ready Provenance

Monitors ammonia compressors, HTST pasteurizers, and Verona ESL aseptic lines via Ignition SCADA while sealing WORM-locked FSMA Section 204 cold-chain and warranty dossiers on Immutable WORM Vault.

Audit Cycle Compression: 54 Wks -> 6 Wks

3-Year Enterprise Pro Forma: Shamrock Value vs. Net Spend

Standalone entity billing across 8 facilities with overarching 20.0% Enterprise Master Discount

60-Day Clone Rollout

Commercial Deal Architecture (20% Discount Applied)

Aligned with Shamrock's decentralized divisional P&L structure

Commercial Component Net Rate to Shamrock
60-Day Facility POV Fee (100% Credited at Go-Live) $40,000 / site
Payment Integrity Cloud License (PIEB/AREB/CREB) $9,600 / mo / site
Strata Carbon & Plant Health Telemetry SaaS $6,400 / mo / site
Dedicated GCP + BigQuery + Cloud SQL Enclave $1,200 / mo / site
AREB Historical Lookback Share (Yr 1 / Yrs 2+) 9.6% / 8.0%
Strata Carbon Origination & Clearing 8.0% + 4 bps
Minimum Value Guarantee (Anchor / Satellite) $250k / $150k
Rollout Cadence: Wave 1 (Phoenix + Stanfield) launches in Y1-Q1; remaining 6 hubs clone within 60 days in Y1-Q2, reaching full 8-hub production ($1.65M/yr base run rate) by Y1-Q3.