Geothermal engineering

Respect the physics behind the ton.

Document net generation and project emissions with the engineering context needed for qualified assessment.

Book an evidence review ↗Contact us →
Geothermal consultants
For geothermal engineering

The built pack names its limits.

Geothermal is one of sixteen industry packs, all built on the same engine. A parasitic-energy ratio above 0.15 of the supplied baseline is a warning. The engine does not read a weather service. Exchanger resistance above 1.25 times the clean baseline is a warning, and zero flow on that check stays unevaluated. An injectivity drop above 0.20 is a warning. Drive at or below zero stays unevaluated. A missing factor stays unevaluated. It is not stored as zero. This page does not show a live plant.

Open the plant health console ↗
The practical value

Built around your decisions.

01 / POWER

Reconcile net exports

Distinguish gross generation from imports, auxiliary consumption, and storage charging.

02 / FLUIDS

Account for gas

Track non-condensable gas and applicable measurement boundaries.

03 / WELLS

Monitor physical performance

Consider injectivity and operating behavior as part of the evidence context.

04 / METHOD

Version your assumptions

Expose emissions factors, baseline logic, and methodology applicability for review.

Discovery checklist

What we would establish first.

These are scoping inputs, not a claim that every item is already integrated at your facility.

  • Gross generation, net export, import, and auxiliary load data
  • Gas measurement and appropriate analyzer quality records
  • Project boundaries, applicable methodology, and baseline
  • Engineer-reviewed assumptions and supporting documentation

Strata does not replace qualified engineering, tax, regulatory, or independent-verifier judgment.

Start with your plant

Make your next reporting cycle less of a scramble.

Book an evidence review ↗Discuss a facility →