Investigate an alert
Review the affected PI tag, sample time, and deterministic trigger.
Equipment evidence is useful only when technicians can identify the instrument, the timestamp, the exception, and the action owner.
The built connector is a read-only AVEVA PI Web API path, plus a CSV history import. It does not change a setpoint or command plant equipment. A flat reading, a substituted value, an archive backfill, and a missing sample stay different. A calibration due within 30 days is advisory. Within 7 days it is a warning. After the due date, the past-due check is critical and blocks. No due date stays unevaluated. There is no work-order endpoint. A draft does not open one.
Open the plant health console ↗Review the affected PI tag, sample time, and deterministic trigger.
Connect measurement exceptions to instrument history and calibration dates.
Identify frozen, drifting, substituted, or missing values without guessing.
Document the follow-up so evidence reviewers can understand what happened.
These are scoping inputs, not a claim that every item is already integrated at your facility.
Strata does not replace qualified engineering, tax, regulatory, or independent-verifier judgment.